INDOT Work begins on the US 41 Bridge over Sugar Creek Monday

The Indiana Department of Transportation (INDOT) announces U.S. 41 will be restricted to one 12’ lane beginning on or after Monday, August 22 for a bridge deck overlay, located approximately one mile north of State Road 47. American Contracting was awarded the $257,959 contract.  This project will overlay the bridge deck over Sugar Creek. Traffic will be controlled with a traffic signal at the bridge during construction.

Tags: , , , ,